客户评价

4.7

236 条评价·全部来自已验证的购买

产品质量 4.7·沟通 4.6·交期 4.5

为这次合作打分

–

产品图片均在客户书面授权后发布。

RB

Russell

工程副总裁

美国

2026年10月17日

评价为买家原文(英语)。

We have been through the phase where a supplier is cheap and then the phase where they are expensive, and these are the first ones where the price has stayed and the quality went up. The engineering reviews got sharper over the years, not…

PC

Peta

采购经理

澳大利亚

2026年10月14日

评价为买家原文(英语)。

Stainless guards, chutes and drip trays for a bottling line, 130 pieces, all 304 with a 2B finish. Wine is aggressive on anything that is not properly passivated, and their passivation certificate actually lists the bath and the immersion…

伟欣钣金已回复 · Jack, 机械工程师

The bath on your parts was 20% nitric at 50 C for 30 minutes, which is why the certificate lists both figures. On 2B sheet that removes free iron without changing the surface roughness.

MT

Marissa

制造工程师

美国美国

2026年10月4日

评价为买家原文(英语)。

Aluminium 6061 frame plates for an agricultural drone, 6mm, waterjet plus fold where possible. Weight is everything on these so they reworked the flat pattern to remove two bends and one doubler, and it still passed our static load case.…

NK

Niamh

质量主管

爱尔兰爱尔兰

2026年9月25日

评价为买家原文(英语)。

Clean room grade stainless panels, 304, brushed, 140 pcs. We needed the Ra value on the visible face documented and they measured it on every panel rather than sampling, which is unusual. The edges were rolled rather than sheared so there…

伟欣钣金已回复 · Jack, 机械工程师

We measure Ra with a portable skidded gauge in three directions and take the worst of the three. 2B coil sits at 0.6-0.8 before brushing, so the 0.4 you asked for is a brushing spec rather than the coil.

HG

Harriet

采购专员

英国英国

2026年9月21日

评价为买家原文(英语)。

Stainless splashbacks and shelves for commercial kitchens, 260 pcs. Every one is a slightly different size because they are made to the kitchen drawings, and they handled that without a per part setup charge. Lead time was 5 weeks…

DF

Duncan

运营经理

加拿大加拿大

2026年9月13日

评价为买家原文(英语)。

Mine duty junction boxes, 180 pcs, 2mm SECC with a heavier powder coat than usual because of the abrasive dust underground. They asked what the coat had to survive rather than just quoting the RAL, and proposed a 120 micron build with a…

PV

Prakash

生产负责人

印度印度

2026年8月29日

हम 3mm की chapa से हल के हिस्से बनवाते हैं, साल में लगभग 5,000 pieces. दो साल में एक बार भी dimensional complaint नहीं आया। पहले जो supplier था वो हर बार 2-3 mm इधर-उधर कर देता था और हमें jig बदलना पड़ता था। अब वो झंझट खत्म है।

CF

Claudia

质量经理

瑞士瑞士

2026年8月21日

评价为买家原文(英语)。

We audited them in person before releasing the first series, which is our normal process for any new supplier outside the EU. Welding procedures were there, welders certified, callipers and height gauges in calibration with stickers that…

NJ

Nathan

采购专员

澳大利亚澳大利亚

2026年8月17日

评价为买家原文(英语)。

Wear plates and guards in 3mm, 700 pcs, all laser cut. Nothing clever, but they have held the price for two years and the edges come off the machine ready to fit, no linishing. We used to have an apprentice deburr 700 plates, that job does…

PB

Pieter

运营经理

荷兰荷兰

2026年8月15日

Goede kwaliteit, 600 delen per jaar, geen klachten over de passing. Waar ik tegenaan loop is de communicatie in juli en augustus, dan is het soms twee dagen stil en dat is precies de periode waarin wij onze orders voor het najaar plaatsen.…

伟欣钣金已回复 · 伟欣钣金

July and August is our holiday rota and the office runs at half strength. Your autumn order confirmation now goes out a week earlier so the quiet period does not land in the middle of it.

…

客户项目

来自我们订单的真实案例

五个匿名化项目,附买家最关心的数字。客户名称予以隐藏,可按需安排参考客户通话。

客户身份予以匿名。以上数字均取自该项目由我方出具的检验与发运记录——首件检验报告、尺寸报告与运输测试结果可应要求提供。

一级汽车零部件供应商 · 德国 · 采购与质量

级进模冲压支架总成·汽车 / 新能源车

批量范围
60,000 件 / 月
公差
±0.05 mm
材料
SPCC 2.0 mm,镀锌
交付周期
每批次 24 天

客户难题

上一家供应商的模具冲孔开始大量带毛刺,这个支架因此转到了第二家;返修一度占到每批的约 12%,每一票货客户都要为手工去毛刺另付费用。

我们的改法

我们用自己的模具车间重做了这套级进模:11 个工位,按 2.0 mm SPCC 重新确定冲裁间隙,并在模内加了一个锪孔工位,倒角不再需要第二道工序。

结果

投产后头三个月,毛刺返修降到 0.4%。去掉离线去毛刺工序后,单件成本下降约 18%,冲孔公差同时收紧到 ±0.05 mm,现在每一批都随货附首件检验报告。

数据中心机柜 OEM · 美国 · 制造工程

19 英寸机柜侧板与配电单元外壳·数据中心

批量范围
4,000 件 / 票
公差
±0.1 mm
表面处理
粉末喷涂,RAL 7035
交付周期
连续 12 个月准时交付

客户难题

长达 1,200 mm 的侧板过完粉末固化炉后轻微起翘,机柜装配班组得用力把板压到位,成品机柜的门缝因此宽窄不一。

我们的改法

我们对折弯做了预去应力,进固化炉的方式从平托盘改为夹具挂架,并在包装前加了一道平面度检查——花岗岩平台上用千分表测。

结果

1,200 mm 板面的平面度控制在 1.5 mm 以内,连续 12 个月按计划到货,没有一起平面度退货。侧板与配电单元外壳现在同托混装发运,客户少了一道进厂分拣。

包装机械制造商 · 荷兰 · 技术采购

控制柜外壳与线束支架·工业自动化

批量范围
每单 300–800 件
公差
±0.2 mm
材料
SPCC 1.2 mm
交付周期
每年 3–4 批订单

客户难题

客户的柜体图纸把散热槽排布在两个内部安装柱的正下方——装配时螺纹嵌件会顶穿槽边。这个冲突要等第一批柜体装配时才看得出来。

我们的改法

可制造性评审在报价之前就做,所以我们的工程师在同一个 24 小时内指出了这个冲突:散热槽组整体偏移 18 mm,门洞加一道加强筋,嵌件位置调整而柜体外形尺寸不变。

结果

不需要重新开模,客户也避免了一整批柜体返工。之后按同一版图纸,每年保持 3–4 批的重复订单;加筋顺带解决了现场反映的门板发软问题。

半导体设备制造商 · 日本 · 工艺工程

洁净室设备用 304 不锈钢屏蔽板·设备 / 半导体

批量范围
每批 50–200 件
公差
±0.05 mm
材料
304 不锈钢,1.5 mm
表面处理
拉丝,Ra ≤ 0.8 µm

客户难题

拉丝面上的搬运划痕,在客户的来料检验里被判定为污染;每一块被判退的板都要重新拉丝、重新清洗才能装机。

我们的改法

现在整块板的拉丝方向统一,纹路看上去一致;拉丝后两面立即贴 PE 保护膜,包装改为单片装洁净袋,不再叠放。

结果

来料检验退货降到接近零,表面粗糙度在随货的检验报告上标注 Ra ≤ 0.8 µm 并签认。客户随后又把这个图纸标准用到了另外两个板类。

储能系统集成商 · 西班牙 · 产品工程

储能系统模组托盘与散热支架·新能源 / 储能

批量范围
2,500 件 / 月
公差
±0.15 mm
材料
SGCC 1.5 mm + 阳极氧化支架
交付周期
每批次 18 天

客户难题

原设计 2.0 mm 托盘在 45 kg 模组的运输测试中出现了可见挠度,而加厚带来的成本和重量,客户的安装框架并不支持。

我们的改法

我们的工程师按客户的载荷工况做了一轮加强筋排布研究,把平底板改成成形筋布局,散热支架换成阳极氧化铝,安装孔位保持不变。

结果

1.5 mm 料厚下首次送样即通过 ISTA-3A 运输测试,托盘重量减少约 12%,跨中加强件也省掉了。三种模组型号的月产量稳定在 2,500 件。